Feeds:
Posts
Comments

Posts Tagged ‘front door’

It is day 60 and things have finally begun to move forward after two months of backward motion. The builders have started their work, evident from the outside by the porta-potty on the sidewalk and the missing front stairs. On the inside of the house there is more fresh demo: the upstairs section that was the old bathroom floor has been cut out, effectively separating the upstairs into two halves, now joined only by a 6″ wide walking plank for the contractor and his crew. But there is a New Pipe!! A brand new shiny PVC drain pipe in the kitchen and future half-bath! It has gleaming purple glue joints and it serves as a beacon of hope that soon the entire house will be filled with new pieces of stuff, their whole so much larger than the sum of their parts.

58steps

Advertisements

Read Full Post »